Thanksgiving and Some Work on the Basement

Busy times around the Hudge. First off, I did a bunch of work in the basement. It began with some floor repair, and shortly after Adam came and helped frame up some wall action. Then, we had 18 people over for Thanksgiving. Pretty productive week, overall!

Click on an image to view the larger version.

Loaded up 40 2X4's in the 'doza for some action!
I love having a truck!
The floor was in way worse shape than I thought, this all dug up very easily. Bad start to my project.
The digging up was pretty extensive. I probably hauled 500 pounds of dirt out.
The finished trench, cleaned up and ready for filling.
The view from the shop area into what would become the wall.
Quick update on the electrical panel situation.
6 bags of cement later... I had my workout for the day!
VW!
Bonding agent applied for the skim coat.
Almost ready.
Chalked out the wall location for skim coat application.
Skim coat applied.
Additional repair.
Finished product.
Looking towards the future Laundry Room!
Adam came over two days later and we got soem framing action going.
Looking into the shop.
Got the floor plates laid out.
First section is erected. Adam totally smoked this out in like half an hour.
Section section built in less time.
On to Thanksgiving!
Tables set up.
Chillin' in the Den.
Blurry chillin'
There.
Jaime being awesome.
Everyone in their positions for dinner.
Luke.
Arleen and Todd.
Luke again.
Peeps, enjoying after meal fellowship.
More family members.
Twas a good meal.
We demolished dinner, there were a fair amount of leftovers, but not too much.

Photo Album | Home